Information.

Length overall 179.95 m
Beam moulded 32 m

The vessel was towed at the dock on 18 of March and lefty the shipyard on 29th of March.

Work description.

  1. General services for the vessel,
  2. Installation of new water ballast treatment system,
  3. Modification of pipes on the ballast system.
  4. Repair on hatch covers,

The vessel stayed at the shipyard 12 days.

Impressions.