Information.

Length overall 186.96 m
Beam moulded 28.6 m

The vessel was moored to the dock wall on 3 of May and sailed from the shipyard at 13 of May.

Work desciption.

  • General services
  • Repairs on two vessel cranes – removal of pins and renewal of bearings.

We have completed all the works and the vessel left the shipyard.

Impressions.

Liverpool Strait 2024 06 28 at 2.33.57 PM (2)
Liverpool Strait 2024 06 28 at 2.33.58 PM (3)
Liverpool Strait 2024 06 28 at 2.33.58 PM (1)
Liverpool Strait 2024 06 28 at 2.33.58 PM
Liverpool Strait 2024 06 28 at 2.33.59 PM
Liverpool Strait 134237
Liverpool Strait 132804
Liverpool Strait 2024 06 28 at 2.40.04 PM
Liverpool Strait 2024 06 28 at 2.40.05 PM (1)
Liverpool Strait 2024 06 28 at 2.40.05 PM (2)
Liverpool Strait 2024 06 28 at 2.40.43 PM
Liverpool Strait 2024 06 28 at 2.40.44 PM (2)
Liverpool Strait 2024 06 28 at 2.40.44 PM (3)
Liverpool Strait 2024 06 28 at 2.40.44 PM (4)
Liverpool Strait 2024 06 28 at 2.40.44 PM
Liverpool Strait 2024 06 28 at 2.40.45 PM (1)
Liverpool Strait 2024 06 28 at 2.40.45 PM
Liverpool Strait 2024 06 28 at 2.40.46 PM
Liverpool Strait 134404
Liverpool Strait 135602
Liverpool Strait 135659
Liverpool Strait 01

back

To top